For the 4.7 km long tunnel package C-4 of the 121.74 km long Haryana Orbital Rail Corridor (HORC) project, the Rail Vikas Nigam (RVNL) has emerged as the lowest bidder.
The Roz-Ka-Meo Industrial Area in Sohna is close to the construction of two tunnels through the Aravalli Mountains between 24,880 km and 29,580 km.
The New Austrian Tunneling Method (NATM) and the cut-and-cover technique will be used to build the tunnel.
The project's implementing organisation, Haryana Rail Infrastructure Development Corporation (HRIDC), issued an unannounced tender call for the construction of the C-4 package on an EPC basis in November 2022.
Six bidders were in the running when the technical bids opened in February. These included IRCON International, RVNL, ITD Cementation India, APCO Infratech, Gawar Construction and Dilip Buildcon.
RVNL's bid of Rs 10.88 billion has been determined to be the lowest.
Automotive Body Coach Building
Hydraulic & Pneumatic Equipment
Industrial & Shipping Containers, Barrels And Drums
Insulators, Insulation Material & Accessories
Mechanical Power Transmission Tools And Accessories
Miscellaneous Automobile Parts, Components & Equipment
Miscellaneous Electrical & Electronic Items
Ship & Marine Tools, Equipment & Accessories