Ahluwalia Contracts (India) rose 4.73 percent to Rs 440.40 after the company announced new construction orders totaling Rs 5 billion. The first project includes MMRDA (Mumbai Metropolitan Region Development Authority) work at Rs 680.5 million for the design, fabrication, supply and erection of pre-engineering structural steel structures for buildings at Mandale Depot annex workshop at MMRDA's Mumbai Metro Rail project.
The second order is for a major upgrade of Rs 4.62 billion lighthouse for Chandigarh railway station on a modular concept through engineering procurement and construction (EPC). To date, the total order intake for fiscal year 2022-2023 is reported to be Rs 36.44 billion.
Automotive Body Coach Building
Hydraulic & Pneumatic Equipment
Industrial & Shipping Containers, Barrels And Drums
Insulators, Insulation Material & Accessories
Mechanical Power Transmission Tools And Accessories
Miscellaneous Automobile Parts, Components & Equipment
Miscellaneous Electrical & Electronic Items
Ship & Marine Tools, Equipment & Accessories