Water Metro services will begin in September after Kochi Metro Rail Limited (KMRL) received two additional boats from the Cochin Shipyard.
The boats undergo a month of rigorous technical testing before being put into service.
A KMRL official claims that four electric hybrid boats have already been delivered and a fifth is on its way.
A total of 23 electrically powered fast hybrid boats with a capacity of 100 passengers are being built at the Cochin Shipyard for the water metro project.
15 routes connecting 10 islands over a distance of 76 km have been selected for the Rs 7.47
Automotive Body Coach Building
Hydraulic & Pneumatic Equipment
Industrial & Shipping Containers, Barrels And Drums
Insulators, Insulation Material & Accessories
Mechanical Power Transmission Tools And Accessories
Miscellaneous Automobile Parts, Components & Equipment
Miscellaneous Electrical & Electronic Items
Ship & Marine Tools, Equipment & Accessories